Review and merge PR #261 — Jest test runner and typecheck fix to unblock CI #313

Closed
opened 2026-04-10 07:22:32 -04:00 by pook · 5 comments
Owner

PR #261 adds jest.config.ts and fixes typecheck errors. Without a working test runner, the CI quality gate cannot run, which blocks ALL other PRs from merging. This is the single biggest bottleneck for the compliancebot pipeline. Steps: (1) Checkout PR branch, (2) Verify jest.config.ts is correct — module paths, transform config, test environment, (3) Run npx jest locally and confirm tests pass, (4) Run npx tsc --noEmit and confirm zero errors, (5) Resolve conflicts, (6) Merge with squash. Acceptance: PR #261 merged, npx jest runs successfully on main.


Generated by CEO Planner (priority: 2)

PR #261 adds jest.config.ts and fixes typecheck errors. Without a working test runner, the CI quality gate cannot run, which blocks ALL other PRs from merging. This is the single biggest bottleneck for the compliancebot pipeline. Steps: (1) Checkout PR branch, (2) Verify jest.config.ts is correct — module paths, transform config, test environment, (3) Run npx jest locally and confirm tests pass, (4) Run npx tsc --noEmit and confirm zero errors, (5) Resolve conflicts, (6) Merge with squash. Acceptance: PR #261 merged, npx jest runs successfully on main. --- *Generated by CEO Planner (priority: 2)*
Author
Owner

⚠️ Stale Task Alert — This task has been open for 8h with no associated PR.

Possible causes:

  • Worker failed to execute (check logs)
  • Claude CLI produced no changes
  • Task may be too complex for single-session execution

The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.

— CEO Planner (automated)

⚠️ **Stale Task Alert** — This task has been open for 8h with no associated PR. Possible causes: - Worker failed to execute (check logs) - Claude CLI produced no changes - Task may be too complex for single-session execution The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped. *— CEO Planner (automated)*
Author
Owner

⚠️ Stale Task Alert — This task has been open for 8h with no associated PR.

Possible causes:

  • Worker failed to execute (check logs)
  • Claude CLI produced no changes
  • Task may be too complex for single-session execution

The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.

— CEO Planner (automated)

⚠️ **Stale Task Alert** — This task has been open for 8h with no associated PR. Possible causes: - Worker failed to execute (check logs) - Claude CLI produced no changes - Task may be too complex for single-session execution The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped. *— CEO Planner (automated)*
Author
Owner

⚠️ Stale Task Alert — This task has been open for 8h with no associated PR.

Possible causes:

  • Worker failed to execute (check logs)
  • Claude CLI produced no changes
  • Task may be too complex for single-session execution

The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.

— CEO Planner (automated)

⚠️ **Stale Task Alert** — This task has been open for 8h with no associated PR. Possible causes: - Worker failed to execute (check logs) - Claude CLI produced no changes - Task may be too complex for single-session execution The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped. *— CEO Planner (automated)*
Author
Owner

Closed 2026-04-10 final triage pass.

Either the referenced PR is already closed (conflicts with main), or this is a worker-tail task spawned after CEO was paused. Surviving active work tracked by #350 (PR #340 webhook rate limiting) and #351 (PR #336 /generate rate limiting).

Pipeline state: 14 open PRs, CEO paused until PR review pass is complete. Shim /shim/ceo now fetches open issues/PRs and injects into prompt to prevent this duplication loop recurring.

Closed 2026-04-10 final triage pass. Either the referenced PR is already closed (conflicts with main), or this is a worker-tail task spawned after CEO was paused. Surviving active work tracked by #350 (PR #340 webhook rate limiting) and #351 (PR #336 /generate rate limiting). Pipeline state: 14 open PRs, CEO paused until PR review pass is complete. Shim `/shim/ceo` now fetches open issues/PRs and injects into prompt to prevent this duplication loop recurring.
pook closed this issue 2026-04-10 15:12:46 -04:00
Author
Owner

Superseded by #413

Superseded by #413
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pook/compliancebot#313
No description provided.