Review and merge PR #229 — Stripe checkout endpoint for billing revenue #341

Closed
opened 2026-04-10 11:14:15 -04:00 by pook · 1 comment
Owner

PR #229 implements the Stripe checkout session endpoint. This is a revenue blocker — without a checkout endpoint, no customer can pay for compliance document generation.

Acceptance criteria:

  • Review PR #229 for correct Stripe checkout.session.create usage
  • Verify priceId is validated and comes from env config (not hardcoded)
  • Confirm the endpoint creates a Stripe customer if one doesn't exist
  • Check success_url and cancel_url are configurable
  • Verify raw body preservation for webhook signature verification is not broken
  • Merge if all checks pass

Context: Related to issue #307 which tracks the same feature with a fresh scope, but PR #229 already has working code.


Generated by CEO Planner (priority: 2)

PR #229 implements the Stripe checkout session endpoint. This is a revenue blocker — without a checkout endpoint, no customer can pay for compliance document generation. Acceptance criteria: - Review PR #229 for correct Stripe checkout.session.create usage - Verify priceId is validated and comes from env config (not hardcoded) - Confirm the endpoint creates a Stripe customer if one doesn't exist - Check success_url and cancel_url are configurable - Verify raw body preservation for webhook signature verification is not broken - Merge if all checks pass Context: Related to issue #307 which tracks the same feature with a fresh scope, but PR #229 already has working code. --- *Generated by CEO Planner (priority: 2)*
Author
Owner

Closed 2026-04-10 final triage pass.

Either the referenced PR is already closed (conflicts with main), or this is a worker-tail task spawned after CEO was paused. Surviving active work tracked by #350 (PR #340 webhook rate limiting) and #351 (PR #336 /generate rate limiting).

Pipeline state: 14 open PRs, CEO paused until PR review pass is complete. Shim /shim/ceo now fetches open issues/PRs and injects into prompt to prevent this duplication loop recurring.

Closed 2026-04-10 final triage pass. Either the referenced PR is already closed (conflicts with main), or this is a worker-tail task spawned after CEO was paused. Surviving active work tracked by #350 (PR #340 webhook rate limiting) and #351 (PR #336 /generate rate limiting). Pipeline state: 14 open PRs, CEO paused until PR review pass is complete. Shim `/shim/ceo` now fetches open issues/PRs and injects into prompt to prevent this duplication loop recurring.
pook closed this issue 2026-04-10 15:12:47 -04:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pook/compliancebot#341
No description provided.