Build PR #16 branch and verify sitemap.xml output #56

Closed
opened 2026-04-10 22:44:43 -04:00 by pook · 3 comments
Owner

Checkout PR #16 branch: gh pr checkout 16. Run npm install && npm run build. Check if sitemap.xml exists in the build output directory. Post findings as PR comment: build pass/fail, sitemap.xml present/absent, and first 5 lines of sitemap content if present. Use gh pr comment 16 --body "$(results)". Accept: PR #16 has a new comment with build status and sitemap verification results.


Generated by CEO Planner (priority: 3)

Checkout PR #16 branch: `gh pr checkout 16`. Run `npm install && npm run build`. Check if sitemap.xml exists in the build output directory. Post findings as PR comment: build pass/fail, sitemap.xml present/absent, and first 5 lines of sitemap content if present. Use `gh pr comment 16 --body "$(results)"`. Accept: PR #16 has a new comment with build status and sitemap verification results. --- *Generated by CEO Planner (priority: 3)*
Author
Owner

⚠️ Stale Task Alert — This task has been open for 6h with no associated PR.

Possible causes:

  • Worker failed to execute (check logs)
  • Claude CLI produced no changes
  • Task may be too complex for single-session execution

The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.

— CEO Planner (automated)

⚠️ **Stale Task Alert** — This task has been open for 6h with no associated PR. Possible causes: - Worker failed to execute (check logs) - Claude CLI produced no changes - Task may be too complex for single-session execution The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped. *— CEO Planner (automated)*
Author
Owner

⚠️ Stale Task Alert — This task has been open for 6h with no associated PR.

Possible causes:

  • Worker failed to execute (check logs)
  • Claude CLI produced no changes
  • Task may be too complex for single-session execution

The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.

— CEO Planner (automated)

⚠️ **Stale Task Alert** — This task has been open for 6h with no associated PR. Possible causes: - Worker failed to execute (check logs) - Claude CLI produced no changes - Task may be too complex for single-session execution The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped. *— CEO Planner (automated)*
Author
Owner

Closing as stale. Replaced by #66 (PR #16 sitemap build).

Closing as stale. Replaced by #66 (PR #16 sitemap build).
pook closed this issue 2026-04-11 05:03:43 -04:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pook/website-template#56
No description provided.