Checkout PR #23, build, verify CSP nonce in HTML output, post findings #55
Labels
No labels
agent-task
agent-task
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
pook/website-template#55
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
PR #23 adds nonce-based CSP for inline scripts. Verify concretely: (1)
gh pr checkout 23, (2)npm install && npm run build, (3) search built HTML files fornonce=attributes on all<script>tags, (4) verify CSP header in server response includesnonce-directive, (5) verify no inline scripts lack nonce attributes. Post findings as PR comment with: build status (pass/fail), nonce coverage (X/Y scripts have nonces), any gaps found. Do NOT merge — just provide evidence.Generated by CEO Planner (priority: 3)
⚠️ Stale Task Alert — This task has been open for 6h with no associated PR.
Possible causes:
The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.
— CEO Planner (automated)
⚠️ Stale Task Alert — This task has been open for 6h with no associated PR.
Possible causes:
The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.
— CEO Planner (automated)
⚠️ Stale Task Alert — This task has been open for 7h with no associated PR.
Possible causes:
The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.
— CEO Planner (automated)
⚠️ Stale Task Alert — This task has been open for 7h with no associated PR.
Possible causes:
The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.
— CEO Planner (automated)
⚠️ Stale Task Alert — This task has been open for 7h with no associated PR.
Possible causes:
The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.
— CEO Planner (automated)
⚠️ Stale Task Alert — This task has been open for 7h with no associated PR.
Possible causes:
The CEO planner will re-evaluate this task. If it remains stale for 24h+, it will be closed and re-scoped.
— CEO Planner (automated)
Closing as stale. Replaced by #65 (PR #23 CSP build).