Review PR #405 — verify Stripe webhook signature verification and raw body #406

Closed
opened 2026-04-10 14:49:03 -04:00 by pook · 1 comment
Owner

PR #405 implements issue #401 (Stripe webhook endpoint). This is critical for the billing pipeline. Review for: (1) raw body preservation for signature verification (not JSON-parsed body), (2) stripe.webhooks.constructEventAsync with proper error handling, (3) signature verification before any processing, (4) returns 200 for valid events, 400/401 for invalid. Run npx tsc --noEmit. Post merge-readiness as PR comment. Acceptance: review posted covering all 4 criteria.


Generated by CEO Planner (priority: 2)

PR #405 implements issue #401 (Stripe webhook endpoint). This is critical for the billing pipeline. Review for: (1) raw body preservation for signature verification (not JSON-parsed body), (2) stripe.webhooks.constructEventAsync with proper error handling, (3) signature verification before any processing, (4) returns 200 for valid events, 400/401 for invalid. Run `npx tsc --noEmit`. Post merge-readiness as PR comment. Acceptance: review posted covering all 4 criteria. --- *Generated by CEO Planner (priority: 2)*
Author
Owner

Closed 2026-04-10 final triage pass.

Either the referenced PR is already closed (conflicts with main), or this is a worker-tail task spawned after CEO was paused. Surviving active work tracked by #350 (PR #340 webhook rate limiting) and #351 (PR #336 /generate rate limiting).

Pipeline state: 14 open PRs, CEO paused until PR review pass is complete. Shim /shim/ceo now fetches open issues/PRs and injects into prompt to prevent this duplication loop recurring.

Closed 2026-04-10 final triage pass. Either the referenced PR is already closed (conflicts with main), or this is a worker-tail task spawned after CEO was paused. Surviving active work tracked by #350 (PR #340 webhook rate limiting) and #351 (PR #336 /generate rate limiting). Pipeline state: 14 open PRs, CEO paused until PR review pass is complete. Shim `/shim/ceo` now fetches open issues/PRs and injects into prompt to prevent this duplication loop recurring.
pook closed this issue 2026-04-10 15:12:47 -04:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pook/compliancebot#406
No description provided.